Content of our quality control
1, urge the construction unit to establish the project quality assurance system, the construction unit is the project.
The implementer, before the start of the project, requires the contractor according to the engineering characteristics and quality requirements,
Establish a quality assurance system, have clear quality management objectives and responsibilities, and finish
Good quality management procedures and methods.
2, in order to master the project situation and achieve good supervision effect, the supervisors should
Be fully familiar with the drawings, review the construction drawings, and make suggestions to the design unit in time when problems are found.
At the same time, attend the design technical disclosure and the blue prints.the design meeting.
3, in the preparation stage before construction, we should do a good job in quality control and inspection of each working procedure.
Check the cooperation of each working procedure and the corresponding technical measures. Review the facilities prepared by the contractor.
Organization design and technical measures, choose the best construction scheme. Supervise and urge the contractor to demand quality.
Seek the implementation of design technical requirements, attend the technical disclosure meeting of sectional works, and control piles and water.
Check on time.
4. Check and accept the ordered equipment, materials, finished products and semi-finished products in strict accordance with the standard.
Quality, it is strictly prohibited to use unqualified materials without certificate or retest for engineering.
5. Strengthen process control, implement key monitoring on key parts and key processes, and conduct intermediate inspection and technical review.
Inspection and technical review. 6. Supervise and inspect the contractor in strict accordance with the construction specifications, acceptance standards and design drawings.
6. Supervise and inspect the construction unit to carry out construction in strict accordance with the construction specifications, acceptance standards and design drawings.
Paper construction. 7, timely inspection and acceptance of each component distribution project, to meet the requirements of the standard.
7. Check and accept the sub-item distribution projects in time, sign and recognize the items that meet the standards, and make the contractor rework the unqualified items until they are qualified, and stop when necessary.
We will sign and recognize the unqualified items, and the contractor will rework them until they are qualified. If necessary, we will issue a stop order.
Work instructions. 8. Check the special operations personnel and skilled shift workers of the construction unit to take up their posts.
8, check the construction unit of special operations personnel and skilled shift personnel. Work permit, and even spot check according to specifications and operating procedures.
Operation certificate, and even spot check and assessment according to the specifications and operating procedures.